NAER – NOVO AEROPORTO, S.A. TECHNICAL CONSULTANCY ON THE DESIGN / CONSTRUCTION OF THE NEW AIRPORT, OTA

As part of the Parsons, FCG – Fase Consulmar Gapres Consortium, Gapres participated as a Technical Consultant for Airport Planning and Design regarding the Project Base Information and Minimum Technical Requirements for the Ota airport. The main tasks in which Gapres participated were: reviewing, compiling, and structuring information from the ANA Group airports; analyzing issues related to the closure of Portela airport; preparing plans, site layouts, and conceptual drawings to estimate the investment value; cooperating with the financial consultant; and developing the Minimum Technical Requirements.