Structural Rehabilitation Project for the Loureiro Tunnel, at Pk 88.217 of the Douro Line
Services provided Management and coordination of the study for the Structural Rehabilitation of the Loureiro Tunnel over a 400 m section, covering the disciplines of Track, Earthworks and Drainage, Structures, Geology and Geotechnics, Electrical Installations, Environment, and Safety Coordination. The total length of the intervention was 1,000 m.