Extension and refurbishment of Roma Station, as part of the connection of the Lisbon Metro network to CP and Fertagus trains
Services provided Preparation of the Project Revision, including: Retaining structures; Excavation; Foundations; Roof and internal reinforced and prestressed concrete structures; Demolitions; Drainage; External works; Temporary circulation routes and diversion of affected utilities.